Empower Installation Contractors Ongoing Projects

Design and supply of Matasia one additional Line bay and TX bay of 23 MVA, 66/11 KV Substation.


Civil and Electrical installation for the two bay station equipment including, 23 MVa 66/11 KV, 66 KV CBs, 66 KV CTS, 66 KV VTS, 66 KV SA, Gantries, Busbars and Steel Structures, 17 Panel by11 KV Switch boards Panels replcement, SCADA Panels, 66 KV Control and protection panels, Rehabilitation of Equipment Building, Equipment Foundations, Cable trenches and Access roads. The Client is KPLC. The project is 75% Complete.

Design and supply of Syokimau one additional Line bay and TX bay of 23 MVA, 66/11 KV Substation.


Civil and Electrical installation for the two bay station equipment including, 23 MVa 66/11 KV, 66 KV CBs, 66 KV CTS, 66 KV VTS, 66 KV SA, Gantries, Busbars and Steel Structures, 17 Panel by11 KV Switch boards Panels replcement, SCADA Panels, 66 KV Control and protection panels, Rehabilitation of Equipment Building, Equipment Foundations, Cable trenches and Access roads. The Client is KPLC. The project is 75% Complete.

Installation and Construction of 630 LV customer schemes projects


Last Mile Connectivity Project for Design, Installation and Construction of 630 LV customer schemes projects consisting of; 900 Kms of LV Lines, 30,00 Poles and connect 20,000 Customers with all LV line construction accessories. The project is 20% Complete./div>

Rural Electrification project for Design, Installation and Construction of HV and LV Scheme projects


Projects consist of; 62 Schemes of 600 Kms of 33KV and 11 KV Lines, 1.670 Kms of LV lines, 257 Distribution Transformers, and connect 10,020 Customers with all line construction accessories. The project is 5% Complete.

Ngong Substation and Matasia- Magali line connection.


KPLC 66 KV Line Interconnector between Ngong Substation and Matasia- Magali line connection. The Line is 10 Kms and is on L & T Basis where materials are supplied by KPLC

Last Mile Connectivity Project


Last Mile Connectivity Project for Design, Installation and Construction of 630 LV customer schemes projects consisting of; 900 Kms of LV Lines, 30,00 Poles and connect 20,000 Customers with all LV line construction accessories. The project is 80% Complete.